
Britzer Garten

Location:
Berlin – Germany
Project:
Stormwater Management at Britzer Garten
Timeline:
Phases 1–9, On-site Construction Supervision 2013–2015
Client:
Grün Berlin Park und Garten GmbH
Water Engineering:
Redesign of the park according to the zero-runoff principle (86 ha)
Treatment of stormwater runoff in a vegetated soil filter (840 m²) and a sedimentation tank (400 m³)
Replenishment of existing lakes with treated stormwater
Reduction of groundwater recharge



