
Location:
Erfurt – Germany
Project:
BUGA Erfurt 2021 – Nördlicher Geraaue
Timeline:
Conceptual Design 2017
Detailed Design 2018
Construction 2021
Partner:
Landschaftsarchitektur: geskes.hack Landschaftsarchitekten GmbH-Berlin u.A.
Client:
Landeshauptstadt Erfurt
New Water Storage Facility in M3 of BUGA Erfurt 2021:
Nature-based water basin covering 10,000 m²
Inflow from the hydropower plant
Water treatment and recirculation through a vegetated soil filter (374 m²)
Discharge into the Mühlgraben and Gera River



