BVG Bus Deopt

© LOIDL Landschaftsarchitekten

Location:

Berlin, Marienfelde – Germany

Project:

BVG Bus Deopt Säntisstraße

Timeline:

Design Phase 2024 - 2026 Under Construction since 2026

Design Phase 2024 - 2026

Under Construction since 2026

Partner:

Sweco

Zech Bau

Stormwater Management:

  • Complete on-site infiltration of stormwater using swale-trench systems in accordance with the zero-runoff-principle.

  • Storage and reuse of stormwater in retention storage and cisterns as service water for irrigation and vehicle washing.

  • Landscaped pond providing supplementary firefighting water storage and flood protection, while improving the local microclimate through evaporation.

  • Reliable supply of the firefighting and non-potable water networks through pumping and pressure systems.

  • Retention of heavy rainfall for flood protection.

  • 3D planning using BIM.