Nuthewiesen

Location:
Drewitz near Berlin – Germany
Project:
Restoration of the Nuthe Wetlands and Renaturation
Timeline:
Planning: 1998 – 2003, Construction: 2003 / 2004
Water Engineering:
Reconstruction of the Nuthe River (2.5 km)
Creation of Water Protection Zones II and III (2.7 km)
Groundwater recharge through infiltration/irrigation
Prevention of erosion of the lowland bog
Creation of biotope networks, flood prevention


