DNG
Location:
Berlin – Deutschland
Project:
Das Neue Gartenfeld
Timeline:
Urban Design Competition: 1st Prize 2016
Construction Start: 2024
Partners:
COBE Berlin GmbH
Büro HAPPOLD
E-Zeit Ingenieure
SHP
inno2grid
Client:
Bezirksamt Spandau, Berlin
Planungsgemeinschaft D.N.G. & Co. KG, Berlin
Drinking Water and Wastewater Management:
Controlled, throttled wastewater discharge
Drinking water and firefighting water supply
Stormwater Management:
Retention of rainwater (53.5 ha) through green roofs and retention roofs
Increased evaporation through de-sealing and greening
Treatment of rainwater runoff via vegetated soil filters
Construction of a nature-based water basin (10,000 m²) as service water storage and retention area
Reuse of rainwater as service water for irrigation at the neighborhood level
Discharge and treatment of rainwater runoff depending on pollution levels
Infrastructure:
Infrastructure coordination




