Siemensstadt Square
Location:
Berlin – Deutschland
Project:
Siemensstadt Square - S²
Timeline:
Preliminary Design: 2023
Conceptual Design: 2024
Detailed Design: 2026
Partners:
Architecture: AUKETT+HEESE, Berlin
Landscape architecture: GREENBOX Landschaftsarchitekten, Berlin
Client:
Siemens AG, München
Stormwater Management:
Retention and infiltration of rainwater from open spaces, roofs, facades, and public areas (1.3 ha) on private property
Infiltration via swales and planted rain gardens.
Use of infiltration systems as multifunctional areas
Rainwater treatment through the biologically active soil zone
Collection, treatment, and storage of rainwater as service water in cisterns (330 m³), covering >80% of irrigation demand
Drainage and flood prevention for window wells using pumping systems